
1976 -1977
3A. Contained with dredge spoils from
navigational dredging in New Moreau landfill
(clay-lined, TSCA permitted). Also
conducted bank stabilization of remnant
deposits.
(approximately 60 acres). Shoreline
protection upgraded for protection from
100-yr flood. Remedial Action under 1984
ROD. Cost $20 - $30 Million.
off. Bedrock seeps within the mill and
raceways no longer in contact with river.
system installed.
and recovery wells.
pipeline and trench.
seeps.
DNAPL seeps to reach river.
Home | History | Contamination | Hydrologic Cycle